Keep test integration trigger to v1a4 jobs

This PR makes sure that the v1a4 jobs are trigerred when
test-integration is trigerred, since v1a5 is not ready yet to be tested.
To test v1a5 we should use test-v1a5-integration until there is a
release.

Change-Id: Ib8991ef2d7a7fecfd3762bf753af51901cbd8dd5
4 files changed
tree: 6d0b31e1c2392ff0f986629a8dcc50af888db304
  1. jjb/
  2. .gitignore
  3. .gitreview
  4. .yamllint
  5. tox.ini